The block has been machined. The following machinings have be done:
– Decking;
– .030″ Overbore;
– Cylinder honing;
– Line-bore;
– 2.5″ Concrete fill in the waterjackets.
The 440Source.com 4.15″ stroker crank has gotten a 2nd keyway milled and the entire piston, rod and crank assembly has been balanced.
An overview of some of the parts which will find their way in and onto the engine block;